Industry News

Cleveland-Cliffs to resume DRI plant capacity

Views : 539
Update time : 2020-05-13 22:03:22
Cleveland-Cliffs, Inc., a US iron ore and steel producer, aimed to restart the construction of its direct reduced iron (DRI) plant in Toledo, Ohio in the second half of 2020 after suspending works on March 20th in the state's response to the coronavirus pandemic.

The construction of the project was first announced in June 2017. Prior to the shutdown, the new DRI plant was scheduled to open in June 2020 and was expected to have a production capacity of 1.9 million tons by 2021.
Related News
Read More >>
Brazil’s pig iron exports drop by 22.9% in Dec 2025 Brazil’s pig iron exports drop by 22.9% in Dec 2025
Jan .08.2026
Brazil’s pig iron exports drop by 22.9% in Dec 2025
Iron ore hits 10-month high on China's stimulus Iron ore hits 10-month high on China's stimulus
Jan .08.2026
Iron ore hits 10-month high on China's stimulus
Metro Mining hits record bauxite shipment of 6.2 million WMT in 2025 Metro Mining hits record bauxite shipment of 6.2 million WMT in 2025
Jan .08.2026
Metro Mining hits record bauxite shipment of 6.2 million WMT in 2025
Israel’s Finance Minister rejects proposed AD duties on Chinese aluminum Israel’s Finance Minister rejects proposed AD duties on Chinese aluminum
Jan .08.2026
Israel’s Finance Minister rejects proposed AD duties on Chinese aluminum