Industry News

Cleveland-Cliffs to resume DRI plant capacity

Views : 369
Update time : 2020-05-13 22:03:22
Cleveland-Cliffs, Inc., a US iron ore and steel producer, aimed to restart the construction of its direct reduced iron (DRI) plant in Toledo, Ohio in the second half of 2020 after suspending works on March 20th in the state's response to the coronavirus pandemic.

The construction of the project was first announced in June 2017. Prior to the shutdown, the new DRI plant was scheduled to open in June 2020 and was expected to have a production capacity of 1.9 million tons by 2021.
Related News
Read More >>
Vedanta Aluminium signs 5-year natural gas deal with GAIL in shift to renewable energy Vedanta Aluminium signs 5-year natural gas deal with GAIL in shift to renewable energy
Nov .21.2024
Vedanta Aluminium signs 5-year natural gas deal with GAIL in shift to renewable energy
Australian Aluminium Council unites with AAEA, strengthening the downstream manufacturing sector Australian Aluminium Council unites with AAEA, strengthening the downstream manufacturing sector
Nov .21.2024
Australian Aluminium Council unites with AAEA, strengthening the downstream manufacturing sector
Alumina price hike ratio takes a step back; aluminium extrusion export drop potent to lead ingot price drop Alumina price hike ratio takes a step back; aluminium extrusion export drop potent to lead ingot price drop
Nov .21.2024
Alumina price hike ratio takes a step back; aluminium extrusion export drop potent to lead ingot price drop
Rio Tinto collaborates with GravitHy for steel decarbonization project in France Rio Tinto collaborates with GravitHy for steel decarbonization project in France
Nov .21.2024
Rio Tinto collaborates with GravitHy for steel decarbonization project in France