Industry News

Hydro invests money to expand capacity at aluminum extrusion plant in Austria

Views : 180
Update time : 2021-07-30 17:34:45
Hydro announced it will invest EUR 45 million in its aluminum extrusion plant in Nenzing, Austria. The fourth extrusion line will be added and the processing capacity will be increased by 30% as well, creating more local job opportunities.

The construction work was scheduled to begin in early 2022, and the new extrusion line will be put into operations in spring 2023.

The new production capacity brought from the expansion plan will meet the growing demand in this region.
Related News
Read More >>
Taiwan’s Yieh Phui seeks vindication after US preliminary dumping determination on corrosion-resistant steel products Taiwan’s Yieh Phui seeks vindication after US preliminary dumping determination on corrosion-resistant steel products
Apr .17.2025
Taiwan’s Yieh Phui seeks vindication after US preliminary dumping determination on corrosion-resistant steel products
Rio Tinto posts declines in Q1 Pilbara iron ore shipments & production Rio Tinto posts declines in Q1 Pilbara iron ore shipments & production
Apr .17.2025
Rio Tinto posts declines in Q1 Pilbara iron ore shipments & production
China’s crude steel output rises by 4.6% in May, hitting 10-month high China’s crude steel output rises by 4.6% in May, hitting 10-month high
Apr .17.2025
China’s crude steel output rises by 4.6% in May, hitting 10-month high
Philippine SteelAsia to start new steel sections mill in 2027 Philippine SteelAsia to start new steel sections mill in 2027
Apr .17.2025
Philippine SteelAsia to start new steel sections mill in 2027