Industry News

JSW Steel to keep capacity utilization in Karnataka plant in same level amid 50% of workers work from home

Views : 198
Update time : 2020-07-03 16:20:05
It is reported that Indian steelmaker JSW Steel is trying to keep its production level at the main steel plant at Ballari in Karnataka even though 50% of its workers are still working from home amid coronavirus pandemic.

The plant’s utilization in May this year was 83% of the installed capacity, bounced back from 38% during the lockdown in April; the utilization in June is not disclosed yet.

The plant in Karnataka has an annual capacity of 12 million tons of steel and provides direct and indirect livelihood to more than 200,000 people.

Currently, 11,000 employees of the 20,000 workforces of JSW were still requested to work from home.
Related News
Read More >>
China's Guangxi Huasheng to complete alumina project by end-2024 China's Guangxi Huasheng to complete alumina project by end-2024
Nov .13.2024
China's Guangxi Huasheng to complete alumina project by end-2024
Aluminum stocks at Japan's 3 major ports slightly drop in Oct Aluminum stocks at Japan's 3 major ports slightly drop in Oct
Nov .13.2024
Aluminum stocks at Japan's 3 major ports slightly drop in Oct
Vietnam terminates AD measure on cold-rolled stainless steel from 4 countries Vietnam terminates AD measure on cold-rolled stainless steel from 4 countries
Nov .13.2024
Vietnam terminates AD measure on cold-rolled stainless steel from 4 countries
Ukraine’s crude steel & rolled products output rises in Oct, but facing deteriorating global steel market Ukraine’s crude steel & rolled products output rises in Oct, but facing deteriorating global steel market
Nov .13.2024
Ukraine’s crude steel & rolled products output rises in Oct, but facing deteriorating global steel market