Industry News

Metro Mining's bauxite shipment grows by 24% in 2024

Views : 5
Update time : 2025-01-09 16:31:55
In 2024, Metro Mining's Bauxite Hills project in Australia shipped 5.7 million wet metric tons of bauxite, up by 24% year on year, but it failed to meet its previous shipment guidance due to the cancellation of the last cape vessel due to bad weather conditions in December.

Despite this, shipments for the month hit a record high of 480,000 tons, a year-on-year hike of 53%.

Shipments in the fourth quarter of 2024 amounted to 2.1 million wet metric tons, with 100,000 wet metric tons shipped in the first five days of January 2025.

The target shipment volume for 2025 was set at 6.5-7 million wet metric tons.
Related News
Read More >>
India’s SMEL posts 59% surge in stainless steel production in Dec 2024 India’s SMEL posts 59% surge in stainless steel production in Dec 2024
Jan .09.2025
India’s SMEL posts 59% surge in stainless steel production in Dec 2024
Indonesia continues AD duty imposition on hot-rolled flat-rolled products in coils from 7 countries Indonesia continues AD duty imposition on hot-rolled flat-rolled products in coils from 7 countries
Jan .09.2025
Indonesia continues AD duty imposition on hot-rolled flat-rolled products in coils from 7 countries
Nickel Asia in negotiation with SMM for stake sales in CBNC Nickel Asia in negotiation with SMM for stake sales in CBNC
Jan .09.2025
Nickel Asia in negotiation with SMM for stake sales in CBNC
South Korea's cold-rolled stainless steel imports grow in 2024 South Korea's cold-rolled stainless steel imports grow in 2024
Jan .09.2025
South Korea's cold-rolled stainless steel imports grow in 2024