Industry News

Nickel 28 resumes full production at Ramu nickel-cobalt mine’s HPAL plant

Views : 148
Update time : 2025-02-25 16:45:33
Nickel 28 Capital Corp., a Canada-based nickel-cobalt producer, has announced the successful resumption of full production at the Ramu nickel-cobalt mine's high-pressure acid leaching (HPAL) plant in Basamuk, Papua New Guinea, following the completion of mechanical repairs.

The resumption comes after a short-term production reduction in December 2024 due to a mechanical failure of one of the two blowers in the acid plant at the HPAL plant. The fan blower has now been repaired and replaced, allowing the plant to return to full production capacity.

Nickel 28 continues to guide annual production levels in 2025 at Ramu of around 32,000 tons of contained nickel and 2,900 tons of contained cobalt.
Related News
Read More >>
Taiwan's coated steel demand falls short of expectations after typhoon reconstruction Taiwan's coated steel demand falls short of expectations after typhoon reconstruction
Sep .19.2025
Taiwan's coated steel demand falls short of expectations after typhoon reconstruction
Global primary aluminum market has short supply of 119,900 tons in Jul Global primary aluminum market has short supply of 119,900 tons in Jul
Sep .19.2025
Global primary aluminum market has short supply of 119,900 tons in Jul
China's aluminum-related production statistics in Aug China's aluminum-related production statistics in Aug
Sep .19.2025
China's aluminum-related production statistics in Aug
Saudi Arabia accelerates major water transmission projects, raising pipe and long steel demand Saudi Arabia accelerates major water transmission projects, raising pipe and long steel demand
Sep .19.2025
Saudi Arabia accelerates major water transmission projects, raising pipe and long steel demand