Industry News

Nickel 28 resumes full production at Ramu nickel-cobalt mine’s HPAL plant

Views : 38
Update time : 2025-02-25 16:45:33
Nickel 28 Capital Corp., a Canada-based nickel-cobalt producer, has announced the successful resumption of full production at the Ramu nickel-cobalt mine's high-pressure acid leaching (HPAL) plant in Basamuk, Papua New Guinea, following the completion of mechanical repairs.

The resumption comes after a short-term production reduction in December 2024 due to a mechanical failure of one of the two blowers in the acid plant at the HPAL plant. The fan blower has now been repaired and replaced, allowing the plant to return to full production capacity.

Nickel 28 continues to guide annual production levels in 2025 at Ramu of around 32,000 tons of contained nickel and 2,900 tons of contained cobalt.
Related News
Read More >>
Taiwan’s Yieh Phui seeks vindication after US preliminary dumping determination on corrosion-resistant steel products Taiwan’s Yieh Phui seeks vindication after US preliminary dumping determination on corrosion-resistant steel products
Apr .17.2025
Taiwan’s Yieh Phui seeks vindication after US preliminary dumping determination on corrosion-resistant steel products
Rio Tinto posts declines in Q1 Pilbara iron ore shipments & production Rio Tinto posts declines in Q1 Pilbara iron ore shipments & production
Apr .17.2025
Rio Tinto posts declines in Q1 Pilbara iron ore shipments & production
China’s crude steel output rises by 4.6% in May, hitting 10-month high China’s crude steel output rises by 4.6% in May, hitting 10-month high
Apr .17.2025
China’s crude steel output rises by 4.6% in May, hitting 10-month high
Philippine SteelAsia to start new steel sections mill in 2027 Philippine SteelAsia to start new steel sections mill in 2027
Apr .17.2025
Philippine SteelAsia to start new steel sections mill in 2027