Industry News

Norsk Hydro's Paragominas bauxite mine resumes power supply

Views : 414
Update time : 2020-07-07 16:23:28
It was reported that Norsk Hydro's Paragominas bauxite mine has resumed power supply and restarted its production. However, its Alunorte alumina refinery has cut its production capacity by 50-70% because bauxite supply from Paragominas mine was interrupted.

Norsk Hydro is now clarifying the cause of the accident with local authorities, and it was initially determined that the accident was due to that the transmission tower components were stolen.
Related News
Read More >>
Taiwan's coated steel demand falls short of expectations after typhoon reconstruction Taiwan's coated steel demand falls short of expectations after typhoon reconstruction
Sep .19.2025
Taiwan's coated steel demand falls short of expectations after typhoon reconstruction
Global primary aluminum market has short supply of 119,900 tons in Jul Global primary aluminum market has short supply of 119,900 tons in Jul
Sep .19.2025
Global primary aluminum market has short supply of 119,900 tons in Jul
China's aluminum-related production statistics in Aug China's aluminum-related production statistics in Aug
Sep .19.2025
China's aluminum-related production statistics in Aug
Saudi Arabia accelerates major water transmission projects, raising pipe and long steel demand Saudi Arabia accelerates major water transmission projects, raising pipe and long steel demand
Sep .19.2025
Saudi Arabia accelerates major water transmission projects, raising pipe and long steel demand