Industry News

Baosteel's No. 3 blast furnace restarts

Views : 197
Update time : 2022-04-14 19:56:21
Baosteel's No. 3 blast furnace restarted after the overhaul. The blast furnace was put into operation in 1994 for the first time and upgraded to 4,850 cubic meters in 2013 with an annual iron production capacity of 3.98 million tons per year.

The No.3 blast furnace was shut down on December 22, 2021, with a maintenance period of 98 days. It lost about 1 million tons of pig iron production during maintenance.

This upgrade project will eliminate potential safety hazards in the daily production of blast furnaces, achieve clean and green production, and significantly improve service life.
Related News
Read More >>
Taiwan's coated steel demand falls short of expectations after typhoon reconstruction Taiwan's coated steel demand falls short of expectations after typhoon reconstruction
Sep .19.2025
Taiwan's coated steel demand falls short of expectations after typhoon reconstruction
Global primary aluminum market has short supply of 119,900 tons in Jul Global primary aluminum market has short supply of 119,900 tons in Jul
Sep .19.2025
Global primary aluminum market has short supply of 119,900 tons in Jul
China's aluminum-related production statistics in Aug China's aluminum-related production statistics in Aug
Sep .19.2025
China's aluminum-related production statistics in Aug
Saudi Arabia accelerates major water transmission projects, raising pipe and long steel demand Saudi Arabia accelerates major water transmission projects, raising pipe and long steel demand
Sep .19.2025
Saudi Arabia accelerates major water transmission projects, raising pipe and long steel demand