Industry News

Baosteel's No. 3 blast furnace restarts

Views : 256
Update time : 2022-04-14 19:56:21
Baosteel's No. 3 blast furnace restarted after the overhaul. The blast furnace was put into operation in 1994 for the first time and upgraded to 4,850 cubic meters in 2013 with an annual iron production capacity of 3.98 million tons per year.

The No.3 blast furnace was shut down on December 22, 2021, with a maintenance period of 98 days. It lost about 1 million tons of pig iron production during maintenance.

This upgrade project will eliminate potential safety hazards in the daily production of blast furnaces, achieve clean and green production, and significantly improve service life.
Related News
Read More >>
Rising oil prices pressure Vietnam’s inflation control targets Rising oil prices pressure Vietnam’s inflation control targets
Mar .24.2026
Rising oil prices pressure Vietnam’s inflation control targets
South Africa raises AD duties on structural steel from China & Thailand South Africa raises AD duties on structural steel from China & Thailand
Mar .24.2026
South Africa raises AD duties on structural steel from China & Thailand
Rise and fall in LME aluminium: cash climbs to $3,329/t, stocks slip nearly 1% Rise and fall in LME aluminium: cash climbs to $3,329/t, stocks slip nearly 1%
Mar .24.2026
Rise and fall in LME aluminium: cash climbs to $3,329/t, stocks slip nearly 1%
Macro geopolitical risks have yet to subside, and aluminium prices have maintained a fluctuating pattern Macro geopolitical risks have yet to subside, and aluminium prices have maintained a fluctuating pattern
Mar .24.2026
Macro geopolitical risks have yet to subside, and aluminium prices have maintained a fluctuating pattern