Industry News

First batch of iron ore delivered at Rio Tinto's Gudai-Darri mine

Views : 197
Update time : 2022-06-15 20:59:35
Gudai-Darri, Rio Tinto’s first greenfield mine in the Pilbara of Western Australia in more than a decade, successfully delivered its first batch of iron ore recently.

The future production of Rio Tinto's flagship Pilbara Blend™ product will be strongly supported by the Gudai-Darri project.

The mine, with a life of more than 40 years, will further increase production in the remaining period of the year, and it was expected to reach full production capacity in 2023.
Related News
Read More >>
Rising oil prices pressure Vietnam’s inflation control targets Rising oil prices pressure Vietnam’s inflation control targets
Mar .24.2026
Rising oil prices pressure Vietnam’s inflation control targets
South Africa raises AD duties on structural steel from China & Thailand South Africa raises AD duties on structural steel from China & Thailand
Mar .24.2026
South Africa raises AD duties on structural steel from China & Thailand
Rise and fall in LME aluminium: cash climbs to $3,329/t, stocks slip nearly 1% Rise and fall in LME aluminium: cash climbs to $3,329/t, stocks slip nearly 1%
Mar .24.2026
Rise and fall in LME aluminium: cash climbs to $3,329/t, stocks slip nearly 1%
Macro geopolitical risks have yet to subside, and aluminium prices have maintained a fluctuating pattern Macro geopolitical risks have yet to subside, and aluminium prices have maintained a fluctuating pattern
Mar .24.2026
Macro geopolitical risks have yet to subside, and aluminium prices have maintained a fluctuating pattern