Industry News

First batch of iron ore delivered at Rio Tinto's Gudai-Darri mine

Views : 120
Update time : 2022-06-15 20:59:35
Gudai-Darri, Rio Tinto’s first greenfield mine in the Pilbara of Western Australia in more than a decade, successfully delivered its first batch of iron ore recently.

The future production of Rio Tinto's flagship Pilbara Blend™ product will be strongly supported by the Gudai-Darri project.

The mine, with a life of more than 40 years, will further increase production in the remaining period of the year, and it was expected to reach full production capacity in 2023.
Related News
Read More >>
DECO Australia champions sustainable architecture with ASI-backed aluminium commitment DECO Australia champions sustainable architecture with ASI-backed aluminium commitment
Jun .05.2025
DECO Australia champions sustainable architecture with ASI-backed aluminium commitment
DECO Australia champions sustainable architecture with ASI-backed aluminium commitment DECO Australia champions sustainable architecture with ASI-backed aluminium commitment
Jun .05.2025
DECO Australia champions sustainable architecture with ASI-backed aluminium commitment
Metro Mining logs 26% growth in bauxite deliveries, backed by infrastructure gains and cost edge Metro Mining logs 26% growth in bauxite deliveries, backed by infrastructure gains and cost edge
Jun .05.2025
Metro Mining logs 26% growth in bauxite deliveries, backed by infrastructure gains and cost edge
Metro Mining logs 26% growth in bauxite deliveries, backed by infrastructure gains and cost edge Metro Mining logs 26% growth in bauxite deliveries, backed by infrastructure gains and cost edge
Jun .05.2025
Metro Mining logs 26% growth in bauxite deliveries, backed by infrastructure gains and cost edge