Industry News

POSCO's third blast furnace resumes production

Views : 303
Update time : 2020-07-13 21:12:21
According to reports, the third blast furnace of South Korean POSCO has now resumed production.

Although the global economy was in a state of recession, its third blast furnace still spent about 400 billion won in maintenance. After the third blast furnace was repaired, the annual output of crude steel increased by 25% to 4.6 million tons.

The resumption of production of this blast furnace was postponed twice due to reduced demand from automakers, construction companies, and shipyards. It was understood that some of POSCO's 18,000 employees have paid vacations starting June 16, but the company did not disclose specific details.
Related News
Read More >>
Taiwan's coated steel demand falls short of expectations after typhoon reconstruction Taiwan's coated steel demand falls short of expectations after typhoon reconstruction
Sep .19.2025
Taiwan's coated steel demand falls short of expectations after typhoon reconstruction
Global primary aluminum market has short supply of 119,900 tons in Jul Global primary aluminum market has short supply of 119,900 tons in Jul
Sep .19.2025
Global primary aluminum market has short supply of 119,900 tons in Jul
China's aluminum-related production statistics in Aug China's aluminum-related production statistics in Aug
Sep .19.2025
China's aluminum-related production statistics in Aug
Saudi Arabia accelerates major water transmission projects, raising pipe and long steel demand Saudi Arabia accelerates major water transmission projects, raising pipe and long steel demand
Sep .19.2025
Saudi Arabia accelerates major water transmission projects, raising pipe and long steel demand