Industry News

Rio Tinto reaches new power supply agreement with Meridian Energy

Views : 269
Update time : 2021-01-15 18:30:58
Rio Tinto announced on January 13 that it has reached a new agreement with Meridian Energy for power supply, which will enable the Tiwai Point aluminum smelter in New Zealand to continue operations until December 31, 2024.

In July 2020, Rio Tinto announced that it would gradually close the operations at the Tiwai Point aluminum smelter before August 2021, due to high costs of energy and transportation.
Related News
Read More >>
FORNNAX reaches new heights with groundbreaking ceremony for one of the largest manufacturing facility FORNNAX reaches new heights with groundbreaking ceremony for one of the largest manufacturing facility
Mar .07.2025
FORNNAX reaches new heights with groundbreaking ceremony for one of the largest manufacturing facility
Production of LME deliverable KAS-branded aluminium at Kazakhstan’s Eurasian Resources Group has reached the four-million-tonnes milestone Production of LME deliverable KAS-branded aluminium at Kazakhstan’s Eurasian Resources Group has reached the four-million-tonnes milestone
Mar .07.2025
Production of LME deliverable KAS-branded aluminium at Kazakhstan’s Eurasian Resources Group has reached the four-million-tonnes milestone
Efficient power transmission with Diamond Power Infrastructure’s AL 59 wire rods Efficient power transmission with Diamond Power Infrastructure’s AL 59 wire rods
Mar .07.2025
Efficient power transmission with Diamond Power Infrastructure’s AL 59 wire rods
Here’s what GIADEC’s new CEO thinks about Ghana’s integrated aluminium industry and the impact of the bauxite export ban Here’s what GIADEC’s new CEO thinks about Ghana’s integrated aluminium industry and the impact of the bauxite export ban
Mar .07.2025
Here’s what GIADEC’s new CEO thinks about Ghana’s integrated aluminium industry and the impact of the bauxite export ban