Industry News

US' stainless steel prices continue increased due to lack of material

Views : 189
Update time : 2021-08-19 19:00:05
According to the producers in the US, the scheduled shipment still remained at 12 to16 weeks. In fact, the actual shipment was postponed by more than 4 weeks. The supply of cold-rolled coils was in a very shortage till the end of this year.

Affected by the short supply, the US cold-rolled stainless steel coils price rose further in the first half of August. Stimulated by this, US stainless steel mills increased their prices for the base and alloy surcharge. The base price was increased by US$70-80/ton at the end of July.

Asia's offer is cheaper, but the shipping cost is terribly high. According to understanding, the price gap is getting bigger between the market transaction price and mill ex-work price. The shortage of materials was expected to continue further at the end of this year.
Related News
Read More >>
DECO Australia champions sustainable architecture with ASI-backed aluminium commitment DECO Australia champions sustainable architecture with ASI-backed aluminium commitment
Jun .05.2025
DECO Australia champions sustainable architecture with ASI-backed aluminium commitment
DECO Australia champions sustainable architecture with ASI-backed aluminium commitment DECO Australia champions sustainable architecture with ASI-backed aluminium commitment
Jun .05.2025
DECO Australia champions sustainable architecture with ASI-backed aluminium commitment
Metro Mining logs 26% growth in bauxite deliveries, backed by infrastructure gains and cost edge Metro Mining logs 26% growth in bauxite deliveries, backed by infrastructure gains and cost edge
Jun .05.2025
Metro Mining logs 26% growth in bauxite deliveries, backed by infrastructure gains and cost edge
Metro Mining logs 26% growth in bauxite deliveries, backed by infrastructure gains and cost edge Metro Mining logs 26% growth in bauxite deliveries, backed by infrastructure gains and cost edge
Jun .05.2025
Metro Mining logs 26% growth in bauxite deliveries, backed by infrastructure gains and cost edge