Industry News

Linyi Iron and Steel’s 3,500mm stainless steel plate project starts construction

Views : 126
Update time : 2023-06-28 17:58:47
Linyi Iron and Steel Investment Group Stainless Steel Co., Ltd.’s steel plate project has entered the comprehensive construction process.

With a total investment of CNY 2.6 billion, a 3,500mm medium-thick plate production line from heating, rolling, shearing, and pickling to collection will be set up, covering an area of more than 500 acreages.

After the project is put into operation, the annual production of steel plates will reach 2.4 million tons.
Related News
Read More >>
Adaro Minerals subsidiary aims to launch aluminium smelter operations by December 2025 Adaro Minerals subsidiary aims to launch aluminium smelter operations by December 2025
Sep .22.2025
Adaro Minerals subsidiary aims to launch aluminium smelter operations by December 2025
LME aluminium benchmark price inches down by $3.5/t; Alumina price resides at $332.89/t LME aluminium benchmark price inches down by $3.5/t; Alumina price resides at $332.89/t
Sep .22.2025
LME aluminium benchmark price inches down by $3.5/t; Alumina price resides at $332.89/t
Asia struggles to catch up as Europe leads aluminium’s decarbonisation race Asia struggles to catch up as Europe leads aluminium’s decarbonisation race
Sep .22.2025
Asia struggles to catch up as Europe leads aluminium’s decarbonisation race
Former Alcoa site in Maryland to be transformed into Rowan’s data center hub Former Alcoa site in Maryland to be transformed into Rowan’s data center hub
Sep .22.2025
Former Alcoa site in Maryland to be transformed into Rowan’s data center hub